TM.E. has signed with MUSAMI the contract for the design and construction of the waste-to-energy plant in San Miguel Island, in Azores Islands , Portugal.
TM.E. has signed with MUSAMI the contract for the design and construction of the waste-to-energy in San Miguel Island, in Azores Islands , Portugal.
The plant consists of a single line with the capacity of approx. 60,000 tons / year of waste. The installation will produce electricity with an installed power of 7 MWe and is equipped with a semy-dry flue gas treatment with SNCR.