Santong
Malaysiacategory
Industrial ProcessCapacity
150.000 kg/hIn operation since
In progressIN PROGRESS
The challenge was the supply of this thermal oxidizer during COVID-19 pandemic without any delay and within 11 months from the award. Inspections have been carried out by remote witnessing. The thermal oxidizer has been positively commissioned allowing client to comply with local emission regulations and to replace existing acid gas incinerator that was non-compliant with emission limits.